© 2021 Nordson Corporation
3-9
Lift Cylinder Proximity Switch Adjustment
There are three proximity switches on the lift cylinder. They sense the position of the
cylinder piston, and therefore the bottom of the lance, in relation to the hopper fluidizing
plate, the bottom of a powder box, and the purge manifold. Each switch has an LED that
turns on when the switch is closed through the use of a magnet embedded in the cylinder
piston.
LS306
Hopper
LS307
Box
LS308
Purge
Hopper
1.0-in.
(25.4 mm)
Fluidizing Plate
Purge
Bottom of Box
Box
1.0-in.
(25.4 mm)
Figure 3-6 Proximity Switches and Settings (Typical Lift Cylinder Shown)
NOTE:
The lance assembly will stop at the Box or Hopper switch, depending on the
powder source selected. To override the switch, continue to hold the Lance Control
switch in the down position for 3 seconds after it stops.
LS308 Purge Switch (Bottom Switch):
Lower the lance down onto the stop bolt. Slide
the switch up and down while watching the LED. Mark the positions at which the switch
LED turns on in both directions, then secure the switch midway between the on positions.
LS307 Box Switch (Middle Switch):
Position an empty powder box on the table. Lower
the lance assembly down until it is at the recommended height above the bottom of the
box. Slide the switch up or down until the switch LED turns on. Mark the positions at
which the switch LED turns on in both directions, then secure the switch midway between
the on positions.
LS306 Hopper Switch (Top Switch):
Position an empty hopper on the table. Lower the
lance assembly down until it is at the recommended height above the fluidizing plate.
Slide the switch up or down until the switch LED turns on. Mark the positions at which the
switch LED turns on in both directions, then secure the switch midway between the on
positions.
Summary of Contents for Encore XL Powder
Page 8: ...2021 Nordson Corporation 1607027 01 ii Change Record...
Page 12: ...2021 Nordson Corporation 1607027 01 1 4 Safety...
Page 51: ...2021 Nordson Corporation 1607027 01 4 9 Setup 6 5 Figure 4 5 Pneumatic Controls 2 of 2...
Page 60: ...2021 Nordson Corporation 1607027 01 5 8 Operation...
Page 136: ...2021 Nordson Corporation 1607027 01 9 34 Parts...
Page 146: ...2021 Nordson Corporation 1607027 01 10 10Options...
Page 148: ...2021 Nordson Corporation 1607027 01 11 2 Pneumatic and Electrical Diagrams...
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ...ON OFF...
Page 154: ......