© 2021 Nordson Corporation
10-5
Installation
WARNING:
Allow only qualified personnel to perform the following tasks. Follow the
safety instructions in this document and all other related documentation.
WARNING:
Turn off and lock out system electrical power before performing the follow
-
ing tasks. Failure to observe this warning may result in personal injury or equipment
damage.
NOTE:
Inspect all Vibrasonic system components for cleanliness and damage. Contact
your Nordson representative if any components are damaged.
Vibrasonic Transducer and Sieve Screen Installation
1. See Figure 10-3. Clean the sieve screen’s (7) center hub and the bottom of the
transducer (6) with acetone.
NOTE:
The transducer must be secured to the flat side of the sieve screen hub.
2. Place the transducer on the center hub of the sieve screen. Hand tighten the cap
screw (8) through the bottom of the sieve screen.
3. Hold the base of the transducer with the supplied pin wrench and turn the cap screw
with the supplied torque wrench until you hear a click.
4. Install the U-gasket (11) and ground clip (12) on the screen.
5. Set the sieve screen into the vibratory sieve (9). Plug the transducer cable (4) into the
transducer, route the cable through the sieve deck (5), then clamp the sieve deck onto
the sieve pan.
6. Slide the transducer cable through the slit in the plug (10), then install the plug into the
sieve deck.
Controller and Cable Installation
1. See Figure 10-3. Make sure that the voltage selector on the controller (1) is set to
your system’s electrical supply specification.
2. Mount the controller above the powder feed center electrical panel as shown in
3. Connect the control cable (2) to the controller. Route the other end to the feed center
roof.
4. Mount the bulkhead connector (3) in the feed center roof, then route the transducer
cable (4) to the bulkhead connector and plug it in.
Summary of Contents for Encore XL Powder
Page 8: ...2021 Nordson Corporation 1607027 01 ii Change Record...
Page 12: ...2021 Nordson Corporation 1607027 01 1 4 Safety...
Page 51: ...2021 Nordson Corporation 1607027 01 4 9 Setup 6 5 Figure 4 5 Pneumatic Controls 2 of 2...
Page 60: ...2021 Nordson Corporation 1607027 01 5 8 Operation...
Page 136: ...2021 Nordson Corporation 1607027 01 9 34 Parts...
Page 146: ...2021 Nordson Corporation 1607027 01 10 10Options...
Page 148: ...2021 Nordson Corporation 1607027 01 11 2 Pneumatic and Electrical Diagrams...
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ...ON OFF...
Page 154: ......