© 2021 Nordson Corporation
3-4
Pump Flow and Atomizing Air Tubing
See Figure 3-2 and Figure 3-3
. If the pumps are installed at the factory, the flow (black)
and atomizing (blue) air tubing is also installed from the pumps to the air manifolds on
the side wall of the feed center. If not, the pumps are numbered and the tubing must be
connected from the pumps to the appropriate fittings in the air manifolds on the side wall
of the feed center.
Powder Feed Hose Connections
See Figure 3-2 and Figure 3-3. Label and route the powder feed hoses (7) from the spray
guns through the multi-tube grommets (6) on the side wall of the feed center and connect
the hoses to the appropriate pump outlet fittings (1). Refer to your system drawings for
the correct connections.
Hose and Tubing Routing
See Figure 3-3. Allow enough slack in the hoses (7) and air tubing (4, 5) to allow the
lance assembly to travel through its full range of movement without stretching or kinking
the hoses or tubing. Use the bar (3) to support tubing and hoses.
Pump
Retainer
Pump
Level
Sensor
(Hopper)
Level
Sensor
(Box)
Atomizing Air
(8-mm Blue)
Flow-rate Air
(8-mm Black)
Figure 3-2 Pump, Air Tubing, and Powder Feed Hose Installation
Summary of Contents for Encore XL Powder
Page 8: ...2021 Nordson Corporation 1607027 01 ii Change Record...
Page 12: ...2021 Nordson Corporation 1607027 01 1 4 Safety...
Page 51: ...2021 Nordson Corporation 1607027 01 4 9 Setup 6 5 Figure 4 5 Pneumatic Controls 2 of 2...
Page 60: ...2021 Nordson Corporation 1607027 01 5 8 Operation...
Page 136: ...2021 Nordson Corporation 1607027 01 9 34 Parts...
Page 146: ...2021 Nordson Corporation 1607027 01 10 10Options...
Page 148: ...2021 Nordson Corporation 1607027 01 11 2 Pneumatic and Electrical Diagrams...
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ...ON OFF...
Page 154: ......