
Removal and Installation
10-12
Part 7440274
2017 Nordson Corporation
Carriage
Removal
WARNING:
Relieve system air pressure, material pressure, and disconnect power
prior to servicing Pro
−
Meter V2K components. Refer to
Preparation For Maintenance And Service (page 8
information.
Allow only qualified personnel to perform the following tasks. Follow the
safety instructions in this document and all other related documentation.
Clean any material that has spilled. Be sure to follow all applicable
safety and environmental guidelines when cleaning spilled material.
Refer to
1. Remove air actuator. Refer to
Removal and Installation, Air Actuator
for air actuator removal procedure.
2. Remove socket head cap screws and lock washers securing carriage
hard stop to the carriage.
3. Remove socket head cap screws (1) securing carriage (2) to slide
NOTE:
It is not necessary to remove the guide rod, limit switch mount, strike
screw, or strike stop to remove the carriage.
Supply shop air [80
−
100 psi (0.55
−
0.69 MPa, 5.52
−
6.89 bar)] to air
actuator and reposition carriage as required. Repositioning allows
access to carriage
−
to
−
slide block socket head cap screws. See Figure
1
2
3
Figure 10-20 Carriage Removal From Slide Blocks