
Disassembly and Assembly
11-3
Part 7440274
2017 Nordson Corporation
Disassembly
WARNING:
Relieve system air pressure, material pressure, and disconnect power
prior to servicing Pro
−
Meter V2K components. Refer to
Preparation For Maintenance And Service (page 8
information.
Allow only qualified personnel to perform the following tasks. Follow the
safety instructions in this document and all other related documentation.
Clean any material that has spilled. Be sure to follow all applicable
safety and environmental guidelines when cleaning spilled material.
Refer to
1. Remove metering cartridge assembly from metering cylinder housing.
Refer to
Removal and Installation, Metering Cartridge Assembly (page
for metering cartridge assembly removal procedure.
2. Remove pressure transducer from metering cartridge assembly (if
equipped). Refer to
Removal and Installation, Pressure Transducer
for pressure transducer removal procedure.