
System Setup and Calibration
6-4
Part 7440274
2017 Nordson Corporation
3. Add material to the gravity tanks (if equipped).
CAUTION:
Ensure ball valves are in the closed position as material is
added to the gravity tanks.
4. Attach the power cord to the power switch.
5. Supply air to Pro
−
Meter V2K via the air input fitting located on the filter
regulator assembly.
6. Switch Pro
−
Meter V2K power switch to the ON position.
7. Proceed to
Main Menu
HMI Pendant Screen.
8. Select
SETUP LOGIN
push button to proceed to Setup Login HMI
Pendant screen.
9. Log into the HMI Pendant. Refer to
Adjustment And Calibration, HMI
for HMI Pendant login information.
10. Proceed to the
Valve Setup
HMI pendant screen. Place the carriage in
the METER FULL POSITION.
NOTE:
Select
Open Inlet Valves
push button.
Select the
Return Rods
push button to place the carriage in the METER
FULL POSITION.