
Removal and Installation
10-40
Part 7440274
2017 Nordson Corporation
Power Supply Fuse
See Figures 10-49 through 10-52
Removal
WARNING:
Relieve system air pressure, material pressure, and disconnect power
prior to servicing Pro
−
Meter V2K components. Refer to
Preparation For Maintenance And Service (page 8
information.
Allow only qualified personnel to perform the following tasks. Follow the
safety instructions in this document and all other related documentation.
Clean any material that has spilled. Be sure to follow all applicable
safety and environmental guidelines when cleaning spilled material.
Refer to
1. Remove fuse holder from front of power supply switch. See Figures
CAUTION:
Utilize a flat head screw driver, or equivalent tool, to remove
fuse holder from power supply switch.
2. Remove fuse from fuse holder. See Figure 10-52.
Figure 10-49 Fuse Removal From Power Supply Switch (1 of 4)