
Disassembly and Assembly
11-5
Part 7440274
2017 Nordson Corporation
5. Unscrew tie rods (1) from metering cylinder body (3). See Figure 11-62.
1
2
3
4
Figure 11-62 Tie Rod Removal From Metering Cylinder Body
6. Unscrew nuts (4) from tie rods (1). See Figure 11-62.
7. Remove tube (2) from metering cylinder body (3). See Figure 11-62.
8. Utilize a plastic pick with a blunt tip, or equivalent tool, to remove Parbak
ring (1) and O
−
ring (2) from metering cylinder body (3).
1
2
3
Figure 11-63 O
−
ring and Parbak Ring Removal From Metering Cylinder Body
CAUTION:
Do not use sharp or pointed tools to remove O
−
ring and Parbak ring.
Do not reuse O
−
ring and Parbak ring.