
Removal and Installation
10-48
Part 7440274
2017 Nordson Corporation
Pressure Transducer (If Equipped)
Removal
WARNING:
Relieve system air pressure, material pressure, and disconnect power
prior to servicing Pro
−
Meter V2K components. Refer to
Preparation For Maintenance And Service (page 8
information.
Allow only qualified personnel to perform the following tasks. Follow the
safety instructions in this document and all other related documentation.
Clean any material that has spilled. Be sure to follow all applicable
safety and environmental guidelines when cleaning spilled material.
Refer to
1. Disconnect electrical harness connector from pressure transducer.
CAUTION:
Do not kink or otherwise damage electrical harness connector.
2. Unscrew pressure transducer from metering cartridge assembly.
NOTE:
Utilize adjustable wrench, or equivalent tool to unscrew pressure
transducer.
CAUTION:
Do not attempt to scrape hardened material from the pressure
transducer. Attempting to remove hardened material may result in
component damage.
Inspect transducer for damage. Do not reuse damaged pressure
transducer.
1
Figure 10-58 Pressure Transducer Removal