
System description
3
SMO 10
Principle of operation
System diagram
The heating medium side and the hot water side must
be fitted with the necessary safety equipment in accor-
dance with the applicable regulations.
NOTE! This is an outline diagram. Actual installations
must be planned according to applicable standards.
The outline diagram is equipped with accessories.
VXV1
PG
SMO 10
HR
HR
HR
HR
HR
P
FIGHTER 2010
FG1
CP1
RG1
RG2
SV1
SV2
CP2
FG2
VVC
VVG
LP1
UG
RG
FG AV
SÄV
TV
RV
SF
SÄV
SMO 10 is an advanced control module that together
with FIGHTER 2010 / 2005 and existing heating and
hot water equipment forms a complete installation.
SMO 10 can be used for numerous different connec-
tion options, the basic is FIGHTER 2010 / 2005 which
in turn can be docked to an electric boiler, oil-fired boil-
er and accumulator tank, e.g. NIBE VPA.
FIGHTER 2010/2005
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......