
Docking
21
SMO 10
The safety equipment must be installed in accordance
with current regulations for all docking options. See
www.nibe.se/vvs for more docking options.
General
FIGHTER 2010 / 2005 is docked to the oil-fired/pellet boiler
together with SMO 10 and water heater (floating condensing)
VXV1
PG
SMO 10
HR
HR
HR
HR
HR
P
FIGHTER 2010
FG1
CP1
RG1
SV1
VVC
VVG
LP1
UG
SÄV
SMO 10 controls FIGHTER 2010 / 2005, oil-fired boil-
er, circulation pumps, shunts, etc. FIGHTER 2010 /
2005 works with floating condensing against the heat-
ing system and prioritizes hot water charging via the
shuttle valve (VXV1). FIGHTER 2010 /2005 works in
stage 1 or stage 2 depending on the outdoor air tem-
perature and the heating requirement.
If FIGHTER 2010 / 2005 cannot meet the heating
requirement, the oil-fired boiler is started and addition-
al heat is shunted in.
The outline diagram is equipped with accessories.
FIGHTER 2010/2005
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......