Docking
SMO 10
24
FIGHTER 2010 / 2005 and FIGHTER 310 (also FIGHTER 360 and
FIGHTER 410) controlled by SMO 10.
FIGHTER 2010 / 2005 docked to the immersion heater before the
shuttle valve together with an SMO 10 and a double-shelled water
heater (floating condensing)
SMO 10
UG
FG1
RG2
LP 1
FIGHTER 2010
SV1
FIGHTER 2010
VVC
P
SMO 10
FG1
RG1
VXV1
ELK
UG
LP1
VVG
VVCP
Function
FIGHTER 2010 / 2005 only heats the
heating system and FIGHTER 310
only heats the water.
When the demand for hot water is
high, FIGHTER 310's immersion
heater helps to maintain the tempera-
ture.
When FIGHTER 2010 / 2005 cannot
maintain the heating requirement, the
shunt valve SV1 starts to open
towards FIGHTER 310. This means
FIGHTER 310 now works as an addi-
tional heater.
Function
SMO 10 controls FIGHTER 2010 / 2005,
immersion heater, circulation pumps,
shunts, etc. FIGHTER 2010 / 2005 works
with floating condensing against the heating
system and prioritizes hot water charging via
the shuttle valve (vxv1). FIGHTER 2010
/2005 works in stage 1 or stage 2 depending
on the outdoor air temperature and the heat-
ing requirement.
If FIGHTER 2010 / 2005 cannot meet the
heating or hot water requirement, additional
heating is connected from the immersion
heater (ELK)
The outline diagram is equipped with acces-
sories.
NOTE!
It is not possible to combine this
solution with several FIGHTER 2010s /
2005s.
FIGHTER 2010/2005
FIGHTER 2010/2005
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......