
General information for the installer
SMO 10
12
Current regulations require the heating installation to
be inspected before it is commissioned. The inspec-
tion must be carried out by a suitably qualified person
and should be documented. The above applies to
installations with a closed expansion vessel. If the
electric boiler or the expansion vessel is replaced, the
installation must be inspected again.
Inspection of the installation
SMO 10 is installed by mounting it on a wall using four
screws. There are two holes at the rear for mounting
and two straight-through holes in the electrical con-
nection area.
Mounting
405
406
328
276
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......