
Electrical connection
15
SMO 10
VP1: The modular cable is connected between SMO
10 position (4) and FIGHTER 2010 / 2005 VP1
position (44).
VP2: The screened 3-conductor cable is connected
between FIGHTER 2010 / 2005 VP1 position
(44) and FIGHTER 2010 / 2005 VP2 position (44).
VP3:
The modular cable is connected between
FIGHTER 2010 / 2005 VP2 position (44) and
FIGHTER 2010 / 2005 VP3 position (44).
Routing of the cable in FIGHTER 2010 / 2005 should
be done from below in the cable glands on left-hand
side of the heat pump, seen from the front.
LEK
44
FIGHTER 2010 / 2005
Modular cable/3-wire between SMO 10 and several
FIGHTER 2010s / 2005s
29
4
SMO 10
FIGHTER 2010 VP1
FIGHTER 2010 VP2
FIGHTER 2010 VP3
44
44
44
SMO 10
4
LEK
FIGHTER 2010 / 2005 VP3
FIGHTER 2010 / 2005 VP2
FIGHTER 2010 / 2005 VP1
SMO 10
NOTE!
The modular cables should be kept
separate from power cables when cable
routing.
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......