
Docking
23
SMO 10
Several FIGHTER 2010s / 2005s together with SMO 10 and water
heater (floating condensing)
FIGHTER 2010 VP2
FIGHTER 2010 VP1
HR
HR
HR
HR
VVC
SV1
FG1
RG1
SMO 10
CP1
PG
UG
LP2
LP1
VVG
VVC
VXV1
P
SÄV
SÄV
SÄV
AV
AV
BV
BV
RG
TV
RG
TV
BV
SF
SF
SMO 10 controls up to nine FIGHTER 2010s / 2005s
(of which max one for hot water), immersion heater,
circulation pump, shunt, etc. FIGHTER 2010 / 2005
works with floating condensing against the heating
system and prioritizes hot water charging via the shut-
tle valve VXV1. FIGHTER 2010 /2005 works in stage 1
or stage 2 depending on the outdoor air temperature
and the heating requirement.
FIGHTER 2010 / 2005 VP1 heats hot water.
If FIGHTER 2010 / 2005 cannot meet the heating
requirement, additional heated is shunted in from the
oil-fired boiler.
When additional heat is engaged, hot water is heated
using the immersion heater in the hot water heater.
FIGHTER 2010 / 2005 VP1 is connected in at position
(44) using the enclosed modular cable (15 m) from
SMO 10. VP2 is connected in to VP1 using the
screened 3-core cable on the screw terminal (44).
The outline diagram is equipped with accessories.
FIGHTER 2010 / 2005 VP2
FIGHTER 2010 / 2005 VP1
Summary of Contents for SMO 10
Page 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Page 2: ......
Page 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Page 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Page 58: ...SMO 10 56...
Page 59: ......