System Upgrade 8-5
PREPARING YOUR SYSTEM FOR UPGRADE
Note the following, when installing or replacing devices, to improve the performance of NEC
Express5800/ft series.
With the NEC Express5800/ft series, devices can be replaced during the continuous operation.
Take extreme care for electric shock and damage to the component due to short-circuit.
Optional devices cannot be installed or removed during continuous operation. After shutting
down OS, check that the server is powered off, disconnect all power cords and interface
cables from the server before installing or removing the optional devices.
To remove the CPU/IO module during the continuous operation, disable the intended module
(place the module off-line) by using the ftServer Utility of the NEC ESMPRO Agent or the
NEC ESMPRO Manager from the management PC on the network. After a new module is
installed to the server, enable the module using the ftServer Utility or the NEC ESMPRO
Manager.
TIPS:
The system is defaulted to automatically boot the module, once installed. For more
information, see Chapter 5.
Make sure to provide the same hardware configuration on both CPU/IO modules (except SCSI
board).
Use the same slots and sockets on both groups.
Do not install those devices having different specifications, performance, or features.
Before removing the set screws from the CPU/IO modules, place the desired module off-line
using the ftServer Utility or the NEC ESMPRO Manager.
Summary of Contents for N8800-162F
Page 10: ...this page is intentionally left blank...
Page 43: ...General Description 2 7 Front View With front bezel attached With front bezel removed...
Page 46: ...2 10 General Description Rear View R320a E4 R320b M4...
Page 90: ...3 22 Linux Setup and Operation This page is intentionally left blank...
Page 107: ...System Configuration 4 17 Security Move the cursor onto Security to display the Security menu...
Page 124: ...4 34 System Configuration Exit Move the cursor onto Exit to display the Exit menu...
Page 136: ...4 46 System Configuration This page is intentionally left blank...
Page 212: ...6 16 Maintenance This page is intentionally left blank...
Page 236: ...7 24 Troubleshooting This page is intentionally left blank...
Page 267: ...System Upgrade 8 31 PCI 2 PCI 1 R320a E4 R320b M4 PCI 2 PCI 1 PCI 4 PCI 3 Riser Card...