Hardware
134
10. Attach the inner rail removed in step 2 to the server at six positions on the right side and six
positions on the left side (total 12 positions) by using screw B.
11. Mount the server from the front of the rack along the mounted rail assembly by using a lifter.
Push the release lever shown below to unlock before inserting the server
Confirm that there is no obstruction in the location for mounting the server to the rack such
as rear of rack, etc. or the handle is placed downwardly before mounting the server.
IMPORTANT:
●
Install the stabilizer to the front bottom of the rack first when mounting the
server to the rack.
Release Lever
Handle
CAUTION
●
Be careful not to catch your finger when pressing the release lever
to mount the server into a rack.
Summary of Contents for Express 5800
Page 73: ...73 Memo ...
Page 279: ...Hardware 279 3 BIOS Menu screen is displayed ...
Page 339: ...Hardware 339 3 BIOS will start Select Save Exit then press Enter ...
Page 444: ...444 Part Number Part number FRU File ID FRU file ID Asset Tag Asset management tag ...
Page 573: ...573 Memo ...
Page 583: ...Software 583 Memo ...
Page 690: ...Operation and Maintenance 690 Memo ...
Page 719: ...XXIX Memo ...