Hardware
127
Required Tools
Tools required for mounting to rack are a Phillips-head and a flat-blade screw driver.
Mounting Procedure
Mount the server to the rack by following the procedure below.
1. Specify the position (height) to mount the server.
The height of the server is 7U. The following image shows the positional relation between the
lower side of the server and lower side of the slide rail assembly.Hitch the holding tabs to the
same height of the rack for both front side and rear side.
NOTE:
A minus driver is used when changing the position of rack nuts.
装置高さ7U
正面側
装置の底面位置。
2U
こ の 位 置に ホ ー
ル デ ィ ングタ ブ
を引っ掛けます
2U
Front side
The height of server is 7U
Hitch the holding
tabs here
The lower end of the server
Summary of Contents for Express 5800
Page 73: ...73 Memo ...
Page 279: ...Hardware 279 3 BIOS Menu screen is displayed ...
Page 339: ...Hardware 339 3 BIOS will start Select Save Exit then press Enter ...
Page 444: ...444 Part Number Part number FRU File ID FRU file ID Asset Tag Asset management tag ...
Page 573: ...573 Memo ...
Page 583: ...Software 583 Memo ...
Page 690: ...Operation and Maintenance 690 Memo ...
Page 719: ...XXIX Memo ...