5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
95
7545652/00 EN
VACUTAP
®
VR-Ex
2. Position the on-load tap-changer head cover on the on-load tap-changer
head in such a way that the red triangular markings on the on-load tap-
changer head and the on-load tap-changer head cover are aligned.
Figure 93: On-load tap-changer head cover with o-ring
3. Screw the on-load tap-changer head cover onto the on-load tap-changer
head.
Figure 94: On-load tap-changer head cover
5.3.6 Drying on-load tap-changer in transformer tank
Dry on-load tap-changer in accordance with the following instructions to en-
sure the dielectric values assured by MR on the on-load tap-changer.
If you want to dry the on-load tap-changer in the transformer tank, fully as-
semble the transformer first and then undertake drying.