5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
91
7545652/00 EN
VACUTAP
®
VR-Ex
3. Screw the on-load tap-changer head cover onto the on-load tap-changer
head.
Figure 88: On-load tap-changer head cover
5.3.5.2 Vapor-phase drying in the autoclave
If you wish to perform another transformer ratio test after drying, proceed as
described in the section "Performing transformer ratio test following dry-
ing" [
5.3.5.2.1 Moving on-load tap-changer to adjustment position
► Move the on-load tap-changer to the adjustment position. The adjustment
position is indicated in the on-load tap-changer connection diagram in-
cluded in delivery.
5.3.5.2.2 Removing on-load tap-changer head cover
WARNING
Danger of explosion!
Explosive gases under the on-load tap-changer head cover can deflagrate
or explode and result in severe injury or death.
► Ensure that there are no ignition sources such as open flames, hot sur-
faces or sparks (e.g. caused by the build-up of static charge) in the imme-
diate surroundings and that none occur.
► De-energize all auxiliary circuits (for example tap-change supervisory de-
vice, pressure relief device, pressure monitoring device) before removing
the on-load tap-changer head cover.
► Do not operate any electrical devices during the work (e.g. risk of sparks
from impact wrench).