5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
111
7545652/00 EN
VACUTAP
®
VR-Ex
When actuating the change-over selector, a higher torque is required.
1. Switch the on-load tap-changer into the desired operating position. The di-
verter switch operation can be heard distinctly.
2.
NOTICE!
An incomplete tap-change operation may damage the on-load
tap-changer. After operating the diverter switch, continue to crank the
drive shaft of the upper gear unit for 2.5 revolutions in the same direction
in order to correctly complete the tap-change operation.
3. Perform the transformer ratio test.
4. Repeat the transformer ratio test in all operating positions.
5. Switch the on-load tap-changer into adjustment position (see the accom-
panying connection diagram for the on-load tap-changer).
5.4 Installing on-load tap-changer in transformer (bell-type
tank version)
5.4.1 Inserting on-load tap-changer into supporting structure
5.4.1.1 Fastening potential connection unit to selector
1. Lift the potential connection unit by the pre-mounted lifting straps and po-
sition it above the change-over selector.
Figure 114: Lifting potential connection unit