4-6
7. As required, replace the seal for pressure sampling connector (M6M-010063---), seal for
fresh gas and ACGO (M6M-010006---), seal for drive gas and APL discharge
(M6M-010058---) every 12 months.
8. As required, replace the seal for bellows housing (0601-20-78848) and folding bag
(0601-10-69901) every 12 months.
Seal
(
M6M-010058---
)
Seal
(
M6M-010063---
)
Seal
(
M6M-010006---
)
Folding bag
(
0601-10-69901
)
Seal for bellows
housing
(
0601-20-78848
)
Summary of Contents for WATO EX-55
Page 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Page 2: ......
Page 4: ...II FOR YOUR NOTES ...
Page 6: ...IV FOR YOUR NOTES ...
Page 12: ...6 FOR YOUR NOTES ...
Page 58: ...3 22 FOR YOUR NOTES ...
Page 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Page 260: ...6 72 FOR YOUR NOTES ...
Page 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Page 321: ......
Page 322: ...P N 0621 20 78654 1 1 ...