4-8
10. As required, replace the BYPASS large sealing cushion (0601-20-78840) every 12
months.
4.1.1.2 Checkout and Test of the Anesthesia Machine
Perform the following maintenance procedures every 12 months:
1. System inspection (refer to 3.1).
2. Pipeline test (refer to 3.2).
3. Cylinder test (refer to 3.3).
4. Flow control system test (refer to 3.4).
5. Vaporizer back pressure test (refer to
3.5
).
6. O2 flush test (refer to 3.6).
7. Breathing
circuit
test (refer to 3.7).
8. Pressure relief valve test (refer to 3.8).
9. Alarm test (refer to 3.9).
10. AGSS inspection (refer to 3.10).
11. Power failure test (refer to 3.11).
12. Electrical safety test (refer to 3.12).
BYPASS large sealing
cushion
(
0601-20-78840
)
Summary of Contents for WATO EX-55
Page 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Page 2: ......
Page 4: ...II FOR YOUR NOTES ...
Page 6: ...IV FOR YOUR NOTES ...
Page 12: ...6 FOR YOUR NOTES ...
Page 58: ...3 22 FOR YOUR NOTES ...
Page 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Page 260: ...6 72 FOR YOUR NOTES ...
Page 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Page 321: ......
Page 322: ...P N 0621 20 78654 1 1 ...