5-31
5.3.3.2 Leak Test of the Flowmeter Related Assembly
Perform a leak test of the flowmeter related assembly (from flow regulator to float
flowmeter) by using the following tools:
Negative pressure ball (quantity:1)
3106-06-00 adapter connector (quantity:1)
3106-06-08 adapter connector (quantity:1)
3126-04-00 tube plug (quantity:1)
3126-06-00 tube plug (quantity:2)
3126-08-00 tube plug (quantity:3)
PU tube (6X100) (quantity:1)
Cross screwdriver (quantity:1)
Test procedures:
1. Turn off the pipeline gas supplies and turn on the system switch. Bleed the residual
pressure by turning on the flow regulators.
2. Turn off the system switch. Turn on the flow regulators and turn them
counterclockwise for more than half a circle.
3. Pull out No.25 PU tube which connects the float flowmeter to the vaporizer manifold
assembly. The end of the tube which connects the float flowmeter is not pulled out but
the other end is.
4. Pull out No.46, 49 and 51 PU tubes (No.46 and 49 tubes in case of O2+N2O
configuration, No.45 and 51 tubes in case of O2+AIR configuration, and No.45 tube in
case of single O2 configuration) which connect the system switch assembly and
O2-N2O cut-off valve assembly to the flow regulator. The ends of the tubes which
connect the flow regulator are pulled out but the other ends are not.
5. Occlude the pulled-out tube end on the flow regulator by using 3126-04-00 or
3126-06-00 tube plug.
Summary of Contents for WATO EX-55
Page 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Page 2: ......
Page 4: ...II FOR YOUR NOTES ...
Page 6: ...IV FOR YOUR NOTES ...
Page 12: ...6 FOR YOUR NOTES ...
Page 58: ...3 22 FOR YOUR NOTES ...
Page 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Page 260: ...6 72 FOR YOUR NOTES ...
Page 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Page 321: ......
Page 322: ...P N 0621 20 78654 1 1 ...