Unpack, Inspect and Install
248083387-1 Rev 10
3-7
5. Insert the batteries into the compartment, one at a time, with the
wire and connector facing the opening as shown in Figure 3-6.
Connect the cables (the connector is shaped to prevent miswire - do
NOT attempt to defeat this design or explosive fire may result) to
the receptacle in the bay. Repeat for the second battery.
Figure 3-6 Dual-Battery Compartment With Batteries
6. Close the compartment door and tighten the screw locks by turning
them clockwise.
Connect the SOLAIR to AC Power
To charge the battery once it is installed or to operate the 3350, 5350 on
AC power, plug the unit into an AC power source; the battery will start
charging. To operate the SOLAIR while its battery is charging, turn on
the main power switch located on the front of the unit.
The power input is 100-240VAC, 50-60Hz. A ’region-specific’ power
cable is included with the SOLAIR.
Lighthouse recommends using protected power to prevent exposing the
instrument to voltage spikes. Using an uninterruptible power supply
when the SOLAIR is kept in a stationary location will help prevent
damage to the instrument or loss of data in the event of a power outage.
Attach
Cables
Summary of Contents for SOLAIR 3350
Page 1: ......
Page 2: ...00...
Page 6: ......
Page 12: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual t vi 248083387 1 Rev 10...
Page 14: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual ii 248083387 1 Rev 10...
Page 22: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual 2 6 248083387 1 Rev 10...
Page 64: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual 5 6 248083387 1 Rev 10...
Page 142: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual 6 78 248083387 1 Rev 10...
Page 154: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual A 2 248083387 1 Rev 10...
Page 176: ...Lighthouse SOLAIR 3350 5350 Gen E Operating Manual D 2 248083387 1 Rev 10...
Page 183: ...00...
Page 184: ......