Appendix A
User’s Manual Probot
D960R3
A-3
Wa
st
e
Fill
Au
x
Reagent
Vials
Syringe Drive
Dosage Module
PUMP
FILL
PURGE
Rotary Valve
Needle
Tee
µ-Tee
OR
FIGURE A-4 Step 3 – Purge the Tubing
d)
Switch the rotary valve back into the FILL position, withdraw the reagent
solvent and fill the syringe completely.
e)
Remove the plunger from the syringe. Lower the syringe and allow the
contents to drain via gravity, then replace the plunger (FIGURE A-5).
Wa
st
e
Fill
Au
x
Reagent
Vials
Syringe Drive
Dosage Module
PUMP
FILL
PURGE
Plunger
(removed)
Rotary Valve
Needle
Tee
µ-Tee
FIGURE A-5 Step 4 – Drain the Syringe
f)
Reinstall the syringe.
Summary of Contents for Probot 161403
Page 1: ...D960R3 Probot TM Micro Fraction Collector User s Manual P N 161403 www lcpackings com ...
Page 6: ...Table of Contents vi D960R3 User s Manual Probot This page intentionally left blank ...
Page 14: ...CE Declaration xiv D960R3 User s Manual Probot This page intentionally left blank ...
Page 102: ...Appendix C C 6 D960R3 User s Manual Probot This page intentionally left blank ...
Page 112: ...Appendix D D 10 D960R3 User s Manual Probot This page intentionally left blank ...