Field Service Ver. 2.0 Mar. 2006
8. Service Jig
45
bizhub C250P
Maintenance
8.2
Setting up the Service Jig
8.2.1
Prepare the unit necessary for the Service jig
• This operation is necessary only when using the selector for the first time.
1.
Remove the two screws from the
selector, and then remove the upper
cover.
2.
Affix the aluminum tape to the Selec-
tor as illustrated.
4004D295AA
4004D296AA
bizhub_C250P_Total.book 45 ページ 2006年3月27日 月曜日 午前8時28分