Field Service Ver. 2.0 Mar. 2006
11. Other
129
bizhub C250P
Maintenance
11.4.8
Tray 2 Separation Roller
1.
Slide out the Tray 2.
2.
Open the Vertical transport door.
3.
Remove two Claws [1], and remove
the Vertical transport door [2].
4.
Remove two Screws [3], and remove
the Jam processing cover [4].
NOTE
• Make sure the position of the Mylar
when installing the Jam processing
cover.
5.
Remove two Screws [5] and the Tray
2 Separation Roller installation plate
Assy [6].
[1]
[2]
4038F2C011DA
[3]
[3]
[4]
4038F2C012DB
OK
NG
[5]
[6]
4038F2C013DA
bizhub_C250P_Total.book 129 ページ 2006年3月27日 月曜日 午前8時28分