Field Service Ver. 2.0 Mar. 2006
6. Periodical check
33
bizhub C250P
Maintenance
4.
Open the Right Door.
5.
Remove two Screws [1] and release
the Lock of the Image Transfer Belt
Unit [2].
6.
Hold the both sides and lift it to take
out the Image Transfer Belt Unit [3] a
little.
7.
Hold the position [4] as shown in the
left and remove the Image Transfer
Belt Unit [5].
NOTE
• Do not touch the surface of the
Image Transfer Belt Unit.
• Cover the Image Transfer Belt Unit
with something such shade cloth to
protect its surface from dust or for-
eign matter.
8.
Clean the Image Transfer Entrance
Guide and the surface of the IDC/
Registration Sensors.
See P.34, P.35
[1]
[2]
4038F2C023DA
[3]
4038F2C024DA
[5]
[4]
[4]
4038F2C025DA
1
bizhub_C250P_Total.book 33 ページ 2006年3月27日 月曜日 午前8時28分