4.
Preheat the sling to be cut off to 100 °C through 150 °C.
Cut off the sling by gas cutting.
• Tip of the tooth (1)
• Tip of the tooth (2)
NOTICE
Cut off the slings on each portion of the bucket ac-
cording to the shapes. For the cutting off position, see
the following (A)-(A), or (B)-(B).
Be careful that the cutting face does not come into the
bucket body.
• Cutting position (A)-(A)
For the tooth tip (1)
Cut off at the hole bottom of the sling.
• Cutting position (B)-(B)
For the upper part of tooth (2)
Cut off at the position 10 to 20 mm away from the
body.
5.
Finish the cutting face smoothly with a grinder.
6.
Check that the section is not cracked.
METHOD FOR ADJUSTING BUCKET CLEARANCE
k
k
WARNING
It is dangerous if the work equipment moves by mistake
when adjusting the bucket clearance.
Lower the work equipment to the ground, set it in a stable
condition, set the lock lever securely to LOCK position (L),
and stop the engine.
MAINTENANCE PROCEDURE
MAINTENANCE
4-26
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......