Combination of attachments
Select the boom, arm, and bucket from the following table.
Machine model
PC1250
PC1250S
P
Bucket width
(mm )
Work
equip-
ment
Boom
Standard boom
9.1 m
SP boom
7.8 m
Arm
Standard
arm
Rein-
forced
arm
Semi-
long arm
Rein-
forced
semi-
long arm
Long
arm
SP arm
Excluding
side cutter
and side
shroud
Including
side cutter
and side
shroud
Buck-
et
3.4<3.0>
m
3
-
-
B
-
A
-
1500
1670
4.0<3.5>
m
3
B
-
A
-
C
-
1710
1880
5.0<4.3>
m
3
A
-
C
-
-
-
2050
2220
5.2<4.5>
m
3
-
A
-
C
-
-
2050
2110
5.2<4.5>
m
3
Wear re-
sistance
-
B
-
C
-
-
2050
2110
6.7<5.9>
m
3
-
-
-
-
-
A
2280
2340
6.7<5.9>
m
3
Wear re-
sistance
-
-
-
-
-
B
2280
2340
A: For standard work (specific gravity 1.8 t/m
3
or less)
B: For heavy-duty work (specific gravity 2.1 t/m
3
or less)
C: For light-duty work (specific gravity 1.5 t/m
3
or less)
-: No setting
ATTACHMENTS AND OPTIONS
ATTACHMENTS AND OPTIONS
6-5
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......