Working range drawing
Working rang-
es
Unit
PC1250
Standard
arm
PC1250
Reinforced
arm
PC1250
Semi-long
arm
PC1250
Reinforced
semi-long
arm
PC1250
Long arm
PC1250SP
SP arm
A
Maximum dig-
ging reach
mm
15350
15350
16340
16340
17450
14070
B
Maximum dig-
ging depth
mm
9350
9350
10440
10440
11590
7900
C
Maximum dig-
ging height
mm
13400
13400
13490
13490
13910
13000
D
Maximum ver-
tical wall dig-
ging depth
mm
7610
7610
8490
8490
9480
5025
E
Maximum
dumping
height
mm
8680
8680
9000
9000
9440
8450
F
Maximum
reach at
ground level
mm
15000
15000
16000
16000
17130
13670
TRACK SHOES SELECTION
Select the appropriate track shoe to match the operating conditions.
Track shoe selection
Check the classification from the table of Classification by use, and select the shoe from the List of shoe specifi-
cations.
ATTACHMENTS AND OPTIONS
ATTACHMENTS AND OPTIONS
6-6
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......