MAINTENANCE PROCEDURE
INITIAL 100 HOURS MAINTENANCE (ONLY AFTER THE FIRST 100
HOURS)
Perform the following maintenance after the first 100 hours only for the new machine.
• Clean the PTO lubrication filter strainer
For the method of maintenance, see EVERY 500 HOURS MAINTENANCE.
INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500
HOURS)
Perform the following maintenance after the first 500 hours only for the new machine.
• Change oil in swing machinery case
• Change oil in PTO case
• Change oil in final drive case
Special tools are necessary for inspection and maintenance. Ask your Komatsu distributor to perform this work.
For the method of adjustment, see EVERY 1000 HOURS MAINTENANCE and EVERY 2000 HOURS MAINTE-
NANCE.
WHEN REQUIRED
METHOD FOR CHECKING, CLEANING AND REPLACING AIR CLEANER
k
k
WARNING
• When using compressed air, there is a danger that dirt may scatter and cause personal injury.
Always wear protective eyeglasses, dust mask, or other protective equipment.
• When removing the outer element from the air cleaner body, it is dangerous to pull it out by force.
When working in high places or where the foothold is poor, be careful not to fall because of the re-
action when pulling out the outer element.
NOTICE
• Do not clean the air cleaner element until the air cleaner clogging caution lamp on the machine
monitor lights up. If the element is cleaned frequently before the air cleaner clogging caution lamp
on the machine monitor lights up, the air cleaner will not be able to display its performance fully,
and the cleaning efficiency will also go down.
In addition, during the cleaning operation, more dirt stuck to the element will fall inside the inner
element.
• If any dirt enters the engine, it can damage the engine. Be sure to stop the engine before checking,
cleaning, or servicing the air cleaner. Do not check, clean, or service the air cleaner when strong
wind is blowing or in a dusty place.
When replacing the inner element, take extreme care.
• Replace the outer element if it is cleaned 6 times repeatedly or used throughout a year. Replace the
inner element as well at the same time.
METHOD FOR CHECKING AIR CLEANER
The air cleaner clogging caution lamp informs when the air cleaner element should be checked.
MAINTENANCE
MAINTENANCE PROCEDURE
4-13
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......