(5) Boom and arm connection pin (1 place)
(6) Bucket cylinder foot pin (2 place)
(7) Arm cylinder rod pin (1 place)
(8) Arm and link connection pin (1 place)
(9) Arm and bucket connection pin (2 places)
(10) Link connection pin (1 places)
(11) Bucket cylinder rod pin (2 place)
(12) Bucket and link connection pin (1 place)
EVERY 100 HOURS MAINTENANCE
Maintenance for every 10 hours service should be performed at the same time.
METHOD FOR LUBRICATING SWING CIRCLEZ
Items to be prepared
Grease pump
1.
Lower the work equipment to the ground.
2.
Pump in grease through the grease fittings (4 places)
shown by arrows by using a grease pump.
3.
After greasing, wipe off any old grease that is pushed out.
EVERY 250 HOURS MAINTENANCE
Maintenance for every 10 hours service should be performed at the same time.
MAINTENANCE PROCEDURE
MAINTENANCE
4-40
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......