Calibration Procedures
3
Keysight E3631A Service Guide
51
You can also enter calibration constants from the remote interface. Remote
operation is similar to the local front-panel procedure. You can use a computer to
perform the adjustment by first selecting the required setup. The calibration value
is sent to the power supply and then the calibration is initiated over the remote
interface. The power supply must be unsecured prior to initiating the calibration
procedure. A Keysight BASIC program for calibration over the GPIB interface is
listed at the end of this chapter.
For further details on programming the power supply, see chapters 3 and 4 in the
Keysight E3631A User's Guide.
Recommended test equipment
The test equipment recommended for the performance verification and
adjustment procedures is listed below. If the exact instrument is not available, use
the accuracy requirements shown to select substitute calibration standards.
Table 3-1
Recommended test equipment
Instrument
Requirements
Recommended mode
Use
GPIB Controller
Full GPIB capabilities
Keysight 82341C interface
card
Programming and readback
accuracy
Oscilloscope
100 MHz real time digitizing
scope with a 400 MSa/s
minimum sampling rate
Probe: single-ended
Keysight 54602A
Display transient response and
ripple & noise waveform
RMS Voltmeter
20 MHz
Measure rms ripple & noise
Digital Voltmeter
Resolution: 0.1 mV Accuracy:
0.01%
Keysight 34401A
Measure dc voltages
Electronic Load
Voltage Range: 50 Vdc
Current Range: 10 Adc Open
and Short Switches Transient
On/Off
Keysight 6063A
Measure load and line
regulations and transient
response time.
Resistive Loads (R
L
)
1.2?, 100 W
25?, 100 W
Measure ripple and noise
Current monitoring Resistor
(Shunt)
0.1?, 0.01%
Constant current test setup
Summary of Contents for E3631A
Page 1: ...Keysight E3631A Triple Output DC Power Supply Service Guide ...
Page 18: ...18 Keysight E3631A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 22: ...Keysight E3631A Service Guide 22 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 24: ...24 Keysight E3631A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 26: ...26 Keysight E3631A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 33: ...Keysight E3631A Triple Output DC Power Supply Service Guide 31 2 Quick Start ...
Page 50: ...2 Quick Start 48 Keysight E3631A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 67: ...Calibration Procedures 3 Keysight E3631A Service Guide 65 Figure 3 5 Transient response time ...
Page 101: ...Theory of Operation 4 Keysight E3631A Service Guide 97 Block Diagram ...
Page 122: ...5 Service 118 Keysight E3631A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...