![background image](http://html2.mh-extra.com/html/keithley/6517b/6517b_reference-manual_4068717422.webp)
Model 6517B Electrometer Reference Manual
Section 14: SCPI command reference
6517B-901-01 Rev. C / August 2015
14-171
:SPOints <NRf>
This command specifies the number of measurement points for the specified test.
Usage
:TSEQuence:CLEakage:SPOints <NRf>
:TSEQuence:CIResistance:SPOints <NRf>
:SPOints?
<NRf>
1
to
Max Buffer Size
- Number of points in test sequence
Details
This command specifies the number of measurement points for the following tests:
Capacitor leakage test
Cable insulation resistance test
:TSEQuence:CLEakage:SPOints
specifies the leakage test points.
:TSEQuence:CIResistance:SPOints
specifies the resistance test points.
:SPOints?
queries the number of points
Also see
None
:SPINterval <NRf>
This command specifies the time interval between measurement points for the specified test.
Usage
:TSEQuence:CLEakage:SPINterval <NRf>
:TSEQuence:CIResistance:SPINterval <NRf>
:SPINterval?
<NRf>
0 s
to
99999.9 s
Interval between measurement points
Details
This command specifies the time interval between measurement points for the following tests:
Capacitor leakage test
Cable insulation resistance test
:TSEQuence:CLEakage:SPINterval
specifies the leakage test interval.
:TSEQuence:CIResistance:SPINterval
specifies the resistance test interval.
:SPINterval?
queries the interval
Also see
None