4-22
Return to
4200-900-01 Rev. K / February 2017
Section 4: How to Control Other Instruments with the Model 4200-SCS
Model 4200-SCS User Manual
Open the project plan window
In the project navigator, double-click
probesubsites
to open the project plan window. For this
tutorial, five sites on a wafer are to be tested. As shown in
, set up the project plan as
follows and click the
Apply
button at the bottom right-hand corner of the window:
1. Enable (
√
) Project Initialization Steps
2. Enable (
√
) Project Termination Steps
3. Start Execution at Site: 1
4. Finish Execution at Site: 5
Figure 4-29
Modified project plan settings
Test descriptions
Test descriptions for the probesubsites project are provided in
. Tests can be opened in
the workspace by double-clicking them in the project navigator.
NOTE
The connect UTMs are used to control the switch matrix.
Summary of Contents for 4200-SCS
Page 2: ......
Page 4: ......
Page 334: ...Index 6 4200 900 01 Rev K February 2017 Model 4200 SCS User s Manual Index...