4200-900-01 Rev. K / February 2017
Return to
3-73
Model 4200-SCS User’s Manual
Section 3: Common Device Characterization Tests
Figure 3-57
Setting periodic test intervals
Step E: Update and save the subsite setup configuration
Update the window and save your settings or setting changes by clicking the
Apply
button.
NOTE
Subsite Setup tab calculations do not execute / update until you click
Apply
(see
).
Figure 3-58
Saving the subsite setup configuration
In the
Rate (s)
field, enter the
periodic interval (in seconds) at
which stressing is to be stopped and
tests are to be performed: in addition
to any intervals that are specified in
the
Stress / Measure Cycle Times
KITE calculates the Total Cycles /w
Periodic: the total number of cycles:
based on the Stress / Measure
Cycle Times and the Periodic Test
Interval.This value may not exceed
128
.
For the particular example
at left, these were the
Stress
Times
before
entering a
Periodic
Test Interval
.
These were the
Stress Times
after
entering a
Periodic Test Interval
.
The Subsite Setup window updates
and settings are saved.
Summary of Contents for 4200-SCS
Page 2: ......
Page 4: ......
Page 334: ...Index 6 4200 900 01 Rev K February 2017 Model 4200 SCS User s Manual Index...