– 9 –
3-5. Installing the panel
■ Installing the IP-500
1) Fix operation panel installing plate
❸
to an
optional place on the table with two wood
screws
❹
.
As a guide, two perforated holes
❶
(two lo-
cations) have been factory-made on the right-
hand side of the table.
2) Pass panel cable
❷
through hole
❺
in the
table, and connect the cable to the connector
CN101
❻
(uppermost connector) of the elec-
trical box.
Install the panel at the position
where X-move cover or head grip
does not interfere with it since
breakage of the panel will be caused.
❷
❹
❸
❶
❺
❻