2 IBF Power switches
1. If installed insure that the breaker switch of
each IBF (Integrated Battery Feature) is in
the On position.
Note:
The location of the IBF's are directly
to the left of the DASD at the front
of the frame.
2. Repeat this step for each frame.
3 Setting EPO switches
1. At the front of
each frame,
set the red
Unit Emergency Only switch to the ON
position (|).
2. Repeat this step for each frame.
4-6
Installing the System
Summary of Contents for Multiprise 3000 S/390
Page 1: ...S 390 Multiprise 3000 Enterprise Server R IBM Installation Manual SY24 6154 03...
Page 2: ......
Page 3: ...S 390 IBM Installation Manual SY24 6154 03...
Page 8: ...vi Installing the System...
Page 14: ...xii Installing the System...
Page 34: ...1 20 Installing the System...
Page 40: ...2 6 Installing the System...
Page 78: ...5 20 Installing the System...
Page 156: ...6 78 Installing the System...
Page 160: ...7 4 Installing the System...
Page 172: ...B 4 Installing the System...
Page 173: ......
Page 175: ...Spine information IBM S 390 Installation Manual...