Table 2. Firmware Checkpoints (continued)
Checkpoint
Description
Action/
Possible Failing FRU
E158
System firmware waiting for a
virtual terminal to be opened on an
HMC for SMS menus to be
displayed.
Open a virtual terminal window on
the HMC.
E15B
Transferring control to operating
system (service mode boot)
See “Boot Problems/Concerns” on
page 150.
E15F
Adapter VPD probe
Follow the repair action listed for
checkpoint E151.
E170
Start of PCI Bus Probe
Follow the repair action listed for
checkpoint E151.
E172
First pass of PCI device probe
Follow the repair action listed for
checkpoint E151.
E174
Establishing host connection
If the system is not connected to an
active network, or if the target
server is inaccessible (which can
result from incorrect IP parameters
being specified), the system still
attempts to boot and because
time-out durations are necessarily
long to accommodate retries, the
system may appear to hang.
Restart the system and get to the
SMS utilities menu. Under Select
Boot Options, verify:
v
Is the intended boot device
correctly specified in the boot
list?
v
Are the IP parameters correct?
v
Look at the server configuration
for this client.
v
Attempt to ping the target server
using the ping utility in SMS.
E175
BootP request
Follow the repair actions for
checkpoint E174.
E176
TFTP file transfer
Follow the repair actions for
checkpoint E174.
E177
Transfer failure due to TFTP error
condition
See “Boot Problems/Concerns” on
page 150.
E17B
Processor clock speed
measurement
Call service support.
E183
Service processor POST
1. Replace the CEC backplane,
location: U0.1-P1.
2. Go to “MAP 1540: Minimum
136
Eserver
pSeries 630 Models 6C4 and 6E4 Service Guide
Summary of Contents for eserver 630 6C4
Page 1: ...pSeries 630 Model 6C4 and Model 6E4 Service Guide SA38 0604 00 ERserver IBM ...
Page 2: ......
Page 3: ...pSeries 630 Model 6C4 and Model 6E4 Service Guide SA38 0604 00 ERserver IBM ...
Page 16: ...xiv Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 18: ...xvi Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 52: ...System Logic Flow Diagram 32 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 64: ...Internal Signal Cable Routing Diagram 44 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 70: ...50 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 302: ...282 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 350: ...330 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 366: ...346 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 478: ...System Parts 458 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 480: ...System Parts continued 460 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 482: ...Model 6E4 Cover Set and Brackets 462 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 484: ...464 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 494: ...474 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 504: ...484 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 508: ...488 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 526: ...506 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 536: ...516 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 560: ...540 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 568: ...548 Eserver pSeries 630 Models 6C4 and 6E4 Service Guide ...
Page 571: ......
Page 572: ...IBM Printed in U S A August 2002 SA38 0604 00 ...