8.2 Inspection items and schedule
8-3
8. Maintenan
ce and Inspection
8.2 Inspection items and schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often.
Slider type (EC-S13/S13X/S15/S15X)
Inspection period
External
inspection
Internal
inspection
Greasing
Ball screw
Guide
Start of work inspection
○
-
-
-
1-month inspection
○
-
-
-
3-month inspection
-
-
○
○
3-month inspection on
-
-
Depends on greasing timing
(guideline)
6-month inspection
○
○
Every 6 months thereafter
○
○
* Have an inspection on the cushions as well as supplying grease.
Grease supply timing (Guideline)
Maximum operating speed [mm/s]
Grease supply timing (Guideline)
Operation distance
Months
0 to 750 or less
1,250 km
12 months
Over 750 to 1500
2,500 km
Over 1500 to 2000
5,000 km
Summary of Contents for ELECYLINDER EC-S13
Page 2: ......
Page 9: ...Chapter 12 Appendix 12 1 Index 12 1 12 2 Revision history 12 5 ...
Page 10: ......
Page 66: ......
Page 116: ...3 38 3 Wiring ...
Page 136: ...4 18 4 Operation ...
Page 138: ......
Page 146: ......
Page 158: ...6 12 6 Parameters ...
Page 160: ......
Page 184: ...7 24 7 Troubleshooting ...
Page 186: ......
Page 230: ...8 6 How to replace components 8 44 8 Maintenance and Inspection Fan unit model number PSA FNB ...
Page 232: ......
Page 238: ...9 6 9 External Dimensions ...
Page 240: ......
Page 244: ...10 4 10 Life ...
Page 246: ......
Page 249: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 5 ELECYLINDER Chapter12 ...
Page 250: ......
Page 256: ......
Page 257: ......