This section describes operations on a single 15 kVA/20 kVA UPS.
Procedure
Step 1 Install power cables.
Figure 5-1 15 kVA/20 kVA UPS wiring diagram (three-phase input three-phase
output, two power sources)
NO TE
For details about how to install cables for the single system, see the
UPS2000-G-(15 kVA–
20 kVA) Quick Guide
.
----End
5.2.2 Starting the UPS
CA UTION
The configured number of batteries on the LCD must match the actual number.
When the actual number changes, change the configured number. If the
configured number is less than the actual number, the battery lifespan is
shortened. If the configured number is greater than the actual number, battery
leakage may cause a fire.