![background image](http://html.mh-extra.com/html/huawei/ups2000-g-series/ups2000-g-series_user-manual_166640029.webp)
Optional
Component
Model
Function
Remarks
PDU
(PDC-0091V2
ACIOA)
PDC-0091V2ACIOA
● The PDU is
designed for a
1+1 UPS2000-
G-15 kVA/20
kVA parallel
system (three-
phase input
single-phase
output and
single-phase
input single-
phase output).
● It can also be
used in a
UPS2000-G-6
kVA/10 kVA 1+1
parallel system
and 2+0 parallel
system.
PDU
(PDC-0038V4
ACIOA-V2)
PDC-0038V4ACIOA-V2
The PDU works
with the UPS2000-
G-6 kVA (dual-live-
wire input and
dual-live-wire
output) to provide
the maintenance
bypass and load
expansion
functions.
Magnetic
loop
DN85H, H38x22x15 (DMEGC)
E2F, 38x22x15 (FENGYI)
Optimizes the
performance of the TN-C
power distribution system
in the parallel system
scenario.
In a UPS2000-G-15
kVA/20 kVA
parallel system
using the TN-C
power distribution
system, install four
magnetic rings on
the PE cables on
each UPS, bind the
four magnetic
rings together
using binding tape,
and secure them
to the nearest
place.
UPS2000-G- (6 kVA-20 kVA)
User Manual
2 Quick Introduction
Issue 18 (2021-07-16)
Copyright © Huawei Technologies Co., Ltd.
21