FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
6 Installing the Contained Aisles
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
96
Figure 6-23
Installing the door box
Step 6
Secure the door box.
If the door box is evenly and properly placed as shown in
, secure it using M5
screws as shown by (2) in
. If the door box is tilted, adjust it as described in
Figure 6-24
Door boxes in place
Step 7
Adjust the gaps.
After the door boxes are placed, the gaps between the door boxes and the posts may be
uneven and need to be adjusted, as shown in
and
Table 6-3
Door box placement faults
Fault Type
Possible Cause
Measure
Door box tilted with a V-
The top front and rear of the
For details about the