FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
1 Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9
Documentation
Purpose
Obtaining Method
(Remarks)
(1100 mm Deep)
power-on operations for the
PDU8000 Precision PDC.
click
NetCol5000-C 30 kW
Chilled Water In-Row
Precision Air Conditioner
Quick Guide (Simplified
Edition)
Describes the installation
and cable connection for
the NetCol5000-C 30 kW
air conditioners.
The document is delivered
with the device, or you can
click
New Main Way Quick
Guide
Describes how to install the
new main ways.
Delivered with new main
way.
Indoor Cable Tray
Installation Guide
Describes how to install the
in-room cable trays.
Click
Smart Module Battery
Wiring Diagram
Provides guidance about
battery arrangement and
cable connections.
Delivered with battery
cables.
iBAT 2.0-CIM01C2 User
Manual
Describes the installation,
cable connection, and
power-on operations for the
CIM and BIM.
Click
ECC800 Data Center
Controller (ECC Version)
User Manual
Describes the overview of
the ECC800 and its ports,
installation, commissioning,
user interfaces,
maintenance, and
troubleshooting.
The ECC version depends on
the version in use. Click
on the ECC800 WebUI to
obtain the ECC version in
use. Click
iManager NetEco Device
Commissioning Guide-
(NetEco Version)
Describes how to connect
monitoring hardware to the
NetEco.
The NetEco version depends
on the version in use. Click
on the NetEco WebUI to
obtain the NetEco version in
use. Click
iManager NetEco Product
Document - (NetEco
Version)
Describes how to install
monitoring hardware and
configure monitoring
software.
The NetEco version depends
on the version in use. Click
on the NetEco WebUI to
obtain the NetEco version in
use. Click
1.7 Tools and Instruments
This section lists the tools and instruments required for installation.