FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
A Appendix
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
200
Step 4
Rotate the expansion bolt counterclockwise to remove it together with the spring washer and
flat washer.
Put aside the removed expansion bolt for securing the cabinet.
Figure A-1
Expansion bolt
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
Figure A-2
Drilling a hole and installing an expansion sleeve (unit: mm)
----End
A.3 Installing a Floating Nut