FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
1 Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8
Figure 1-6
Smart module layout requirement
1.6 Documents
Before installation, prepare the following documents in addition to this document.
Table 1-3
Documents for hardware installation
Documentation
Purpose
Obtaining Method
(Remarks)
Onsite engineering layout
drawing
Describes the cabinet
layout.
Provided by the engineering
designer or technical support
engineer.
Quick Reference Guide to
the Smart Modular Data
Center
Smart Module Quick
Installation Guide
describes the unpacking
sequence, installation
procedure, and
installation precautions.
Smart Module
Management System
Wiring Diagram
describes how to route
cables for the
management system.
The document is delivered
with the device, or you can
click
UPS5000-E-(40 kVA–128
kVA) Quick Guide
(Integrated UPS 2.0)
Describes the installation,
cable connection, and
power-on operations for the
integrated UPS.
The document is delivered
with the device, or you can
click
PDU8000 Modular
Precision PDC Quick Guide
Describes the installation,
cable connection, and
The document is delivered
with the device, or you can