4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
27
Procedure
Step 1
Move away the base and install expansion bolts, as shown in
Figure 4-9
Installing an expansion bolt (unit: mm)
Step 2
Measure the hole depths and distances. If any deviation is found, mark the positions again and
drill new holes.
Step 3
Deploy the base again, adjust the base position, and partially tighten the expansion bolts.
Step 4
Measure the levelness of the base using a level, as shown by (1) in
Step 5
If the base is not level, put spacers under it, as shown by (2) in
Step 6
Tighten the four expansion bolts using a torque wrench, as shown by (3) in
Figure 4-10
Leveling the fixed base
Step 7
Secure other bases in the same way.
Step 8
After securing bases, connect bases using connecting plates, as shown by (1) in
and secure the screws to the floor holders on the bases, as shown by (2) in