FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
37
Optional: materials that can be purchased from Huawei or by yourself.
Engineering purchasing: materials that are not provided by Huawei and need to be
prepared by the customer.
Prepare the pipes and pipe fastenings listed in
Table 4-2
Pipe requirements
Category Name
Specifications
Remarks
Pipe
Branch
chilled water
supply and
return pipes
Recommended pipe when the
NetCol520 is connected: rubber
hose DN25
Recommended pipe when the
NetCol520 is not connected:
rubber hose DN25, galvanized
steel pipe DN25, PPR pipe
DN32 (inner diameter ≥ 25 mm)
Engineering
purchasing
Humidifier
water inlet
pipe
Connects to the hose: pagoda
connector, rubber hose, and hose
clamp
Connects to the rigid pipe:
connector, PPR pipe, or
galvanized pipe
Engineering
purchasing
Condensate
water pump
drainpipe
DN4 (external diameter Φ = 6 mm)
Standard
configuration;
delivered with the
product
Automatic
condensate
drainpipe
Rubber hose, rigid PPR, or
aluminum-plastic pipe: DN19
(external diameter Φ = 26 mm)
Engineering
purchasing
Main chilled
water supply
and return
pipes
Flange steel pipe or seamless steel
pipe: DN80
Engineering
purchasing
Pipe
fastening
Pipe support
Engineering
purchasing
Thermal
insulation
foam
The thickness of thermal
insulation foam wrapping branch
chilled water supply and return
pipes (DN25): 15–20 mm.
The thickness of thermal
insulation foam wrapping
condensate water pump
drainpipe (DN4): 5 mm.
The thickness of thermal
insulation foam wrapping
automatic condensate drainpipe
(DN19): 10 mm.
Engineering
purchasing